Nant de Drance SA : the company
Nant de Drance SA is a corporation with a share capital of CHF 350 million held by the following four shareholders :
Its main activity is pumped storage hydropower between the Vieux Emosson and Emosson reservoirs, including operation of the associated facilities. The company headquarters are located in Finhaut, Switzerland.
39 %
36 %
15 %
10 %
Nant de Drance SA publications
Ad hoc announcements
- 28 May 2024:
«Assemblée générale 2024 de Nant de Drance SA» - 26 April 2024:
«Nant de Drance SA : une année 2023 qui démontre l’utilité de la centrale» - 13 June 2023:
«14th Annual General Meeting of Nant de Drance SA» - 4 April 2023:
«Nant de Drance SA : commissioning of the power plant a highlight of 2022» - 6 April 2022:
«Nant de Drance SA : 2021 accounts approved»
Press releases
HYDRO Exploitation reprend le mandat d’exploitation de la centrale de Nant de Drance
26/11/2024, 9h00
Sion et Finhaut – Le Conseil d’administration et la direction de Nant de Drance SA ont décidé de confier l’entretien et l’exploitation de la centrale de Nant de Drance à HYDRO Exploitation SA dès le 1er janvier 2025, mandat assuré jusqu’à présent par les CFF. L’équipe d’exploitation actuelle reste en place, assurant ainsi la continuité des activités et le maintien des connaissances.
The Trient: balancing flood protection and biodiversity
14 November 2024
Nant de Drance SA is implementing 14 environmental compensation measures in connection with the construction of its pumped storage power plant. These include ecological restoration and flood protection on part of the Trient watercourse at Vernayaz. The first phase of the work – enlarging the Trient – is a key step in the flood control programme.
Nant de Drance blows out its first candle
3 July 2023, 10:00
1 July 2023 marks the first year of operation of the Nant de Drance pumped storage power plant. For the past year, the 900 MW plant has been demonstrating its importance in stabilising the Swiss and European electricity grids in the face of intermittent solar and wind power generation. The machines have proved to be extremely reliable, enabling the plant to respond very flexibly to market fluctuations.
The inauguration of Nant de Drance
9 September 2022, 10:00
The ninth of September 2022 will remain a significant date for Nant de Drance. The inauguration of this 900 MW pumped storage power plant in Valais, Switzerland takes place today. The event marks the end of a 14-year construction project involving hundreds of workers, skilled workers and engineers from all over Europe working in a challenging alpine and underground environment. Simonetta Sommaruga, member of the Swiss Federal Council and Roberto Schmidt, President of the Valais Council of State will participate in the official inauguration ceremony. The festivities will be dedicated to today’s youth, future generations and the future of energy.
Commissioning of Nant de Drance
18 June 2022
After 14 years of work and intensive testing, the Nant de Drance pumped storage power plant in Valais will be put into operation on 1 July 2022. Thanks to its six extremely flexible machines and a power capacity of 900 MW, Nant de Drance power plant is set to play a key role in the stabilisation of the Swiss and European electricity grids. It will also contribute towards the security of supply of electricity in Switzerland.
Previous press releases
- 26 May 2021:
«A successful balance between hydropower production and nature conservation» - 23 april 2021:
«Nant de Drance SA: 2020 accounts approved» - 15 December 2020:
«New Director for Nant de Drance SA» - 6 August 2020:
«First pump turbine connected to the grid» - 30 june 2020:
«11th Annual General Meeting of Nant de Drance SA» - 13 March 2020:
«Nant de Drance SA: 2019 accounts approved»
- 5 november 2019:
«Nant de Drance: First watering of the supply lines» - 26 june 2019:
«10th Annual General Meeting of Nant de Drance SA» - 26 March 2019:
«Nant de Drance SA: 2018 accounts approved» - 13 December 2018:
«Nant de Drance and Salanfe work together to protect the environment» - 27 September 2018:
«Change to Board of Directors»
- 30 August 2018:
«Nant de Drance: first tests planned» - 21 June 2018:
«9th Annual General Meeting of Nant de Drance SA» - 7 June 2018:
«Nant de Drance SA publishes its 2017 management report» - 3 April 2018:
«New members strengthen management team of Nant de Drance SA» - 13 March 2018:
«Nant de Drance SA: 2017 accounts approved»